Measurement and verification: the next wave of rewarded energy savings
Historical article, 20 January 2021. This page points to Northmore Gordon’s account of how measurement and verification (M&V) supported energy-efficiency certificate projects at that time. Program rules, approved methods and incentive values can change; the 2021 examples are not current eligibility advice.
What the article explains
M&V compares measured energy use after an upgrade with a credible baseline adjusted for relevant conditions, such as production and weather. The original article describes collecting site data before installation, setting a measurement boundary, building an engineering model and documenting savings after the work. It discusses certificate incentives as a possible project value stream, subject to the applicable scheme method and evidence rules.
The article uses historical examples from Van Wyk Flowers, 5G Networks, Molycop and Metro Trains Melbourne. Its project figures are company-reported accounts from the period, not a forecast for a new site.
Read the source-backed 2021 archive overview. For a current project, explore our M&V service and government-scheme guidance, then contact the team to confirm the method and evidence required before implementation.
Images on This Page
-
https://px.ads.linkedin.com/collect/?pid=3718913&fmt=gif
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2020/05/ng-logo.svg
(no alt text)
-
https://secure.gravatar.com/avatar/ab047677377528d869c6355437d1cc98219cfbe4094f611943be2f75fe112a4e?s=96&d=mm&r=g
Picture of Northmore Gordon
-
https://northmoregordon.com/wp-content/uploads/2021/01/Measurement-and-verification-the-next-wave-of-rewarded-energy-savings.jpg
Measurement and verification the next wave of rewarded energy savings - Northmore Gordon
-
https://www.wattly.com/wp-content/uploads/2020/12/irina-iriser-gEotiAvI5Vc-unsplash2-scaled.jpg
banner-wattly-pty-ltd-van-wyk
-
https://www.wattly.com/wp-content/uploads/2020/10/istockphoto-1131198259-612x612-1.jpg
Data Centre - Wattly Pty Ltd
-
https://www.wattly.com/wp-content/uploads/2021/01/EISA-MV-7-1.jpg
(no alt text)
-
https://www.wattly.com/wp-content/uploads/2020/11/shutterstock_1839603007-12-scaled.jpg
Wattly-comeng-train
-
https://northmoregordon.com/wp-content/uploads/2025/11/Markets-update-news-WEB-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/09/GreenPower_Renewable-Gas-Certification-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/09/SRES-changes-banner-300x139.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/10/webinar-banner-1.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2026/09/shutterstock_2761180357.jpg
ASRS Group 3: Are you in scope and don't know it - ASRS Reporting Standards - Northmore Gordon
-
https://northmoregordon.com/wp-content/uploads/2025/11/Compliance-Update-–-November-2025-1024x474.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2025/11/Markets-update-news-WEB-1024x474.jpg
(no alt text)
-
https://northmoregordon.com/wp-content/uploads/2020/05/ng-logo.png
(no alt text)